N. Main Street Cultural Connector Project – Beginning July 8th


The City of Elmira announces a change in traffic patterns, beginning Monday, July 8, in the N. Main Street Cultural Connector Project Corridor.

The roadway reconstruction phase of Elmira’s downtown Cultural Connector Project will begin next week. As such, all Park Place traffic between W.Third and W.Clinton Streets will be detoured onto North Main Street until early September.

Travel on N.Main Street between W.Third and W.Clinton Streets will temporarily operate as 2-way traffic, flowing in both directions during this period.

North MainStreet will revert back to one-way travel once construction is complete. Variable Message Signs (VMS) and detour signage are in place to help drivers travel through the corridor.

Please drive safely, and allow extra time in the event of construction delays.
Thank you for your cooperation.